Home/Calculators/Electrical Panel Upgrade Cost Calculator
2026 data · Free · No signup

Electrical Panel Upgrade Cost Calculator

Bottom line

In 2026, upgrading an electrical panel in the U.S. typically costs $1,800–$6,500, with the national median near $2,800 for a 100A→200A panel swap and $4,800 for a full service upgrade with new meter and mast.

Typical range
$1,800 – $6,500 (panel + service upgrade)
National median
$2,800 (100A→200A swap) · $4,800 (full service upgrade)
Biggest cost driver
Service upgrade scope (panel-only vs panel + meter + mast + utility coordination)
When to act
Upgrade now if you have FPE/Zinsco/Federal Pioneer (fire risk), 60A or 100A service in 2026 (insufficient), or planning EV/heat pump.

Electrical panel pricing is driven by four variables: target amperage (100A, 200A, 320A, 400A), scope (panel-only swap vs full service upgrade including meter base, weatherhead, and grounding), brand (Square D, Eaton, Siemens, Leviton), and any code-required upgrades (whole-house surge protector, AFCI/GFCI breakers, grounding electrode system). This calculator uses 2026 licensed electrician labor rates plus permit and inspection costs.

Use this page if you have a Federal Pacific (FPE), Zinsco, or Federal Pioneer panel (fire-risk recall candidates), 60A or 100A service in 2026, plans for an EV charger or heat pump, or a panel that's tripping breakers regularly. Output includes a recommended amperage, a load-calculation summary, and a utility-coordination checklist.

2026 installed electrical panel and service upgrade cost

All figures reflect 2026 installed cost (median U.S. pricing including labor, materials, permits, and disposal).

Scope100A panel200A panel320A/400A panelNotes
Panel-only swap (same amperage)$1,800$2,400$4,200Existing service stays
Panel upgrade (100A → 200A)$2,800Most common upgrade
Full service upgrade (panel + meter + mast)$3,200$4,800$7,200New utility connection
FPE/Zinsco replacement$2,400$3,200$5,400Insurance often requires
Sub-panel addition$1,200$1,800$2,800Garage, ADU, addition
EV charger circuit (50A)+$650+$650+$650Adds to any panel project

Regional cost adjustments

Northeast

1.20–1.40×

Boston 100A→200A upgrade ≈ $3,800

West

1.25–1.50×

San Francisco full service upgrade ≈ $7,200

Midwest

0.92–1.02×

Chicago 100A→200A ≈ $2,800

Southeast

0.85–0.95×

Atlanta 100A→200A ≈ $2,500

Southwest

0.92–1.05×

Phoenix full service upgrade ≈ $4,900

Decision framework

Replace immediately

Trigger: FPE Stab-Lok, Zinsco, Federal Pioneer, or Pushmatic panel (fire risk)

Action: Insurance often non-renews; full panel + breakers replacement

Upgrade within 12 months

Trigger: 60A or 100A service + planning EV, heat pump, induction range, or hot tub

Action: Upgrade to 200A and add EV circuit at the same time

Plan within 24 months

Trigger: Panel >40 yrs old, full of breakers, occasional nuisance trips

Action: Build $4K sinking fund; coordinate with siding/trim work

Ready for a personalized estimate?

Run the live calculator with your home size, age, and region for a 60-second tailored result.

Open the calculator

Frequently asked questions

Related calculators & guides

Topics covered
electrical panel upgrade cost calculator
200 amp panel upgrade cost 2026
100 to 200 amp upgrade cost
fpe panel replacement cost
zinsco panel replacement cost
service upgrade cost
ev charger panel upgrade