Your Inspection Report Is Back. What Should You Fix First?

After your home inspection: confirm deadlines, clarify findings, get specialist quotes and turn the report into a repair and first-year plan.

After a home inspection, confirm your contract deadline, read the full report, clarify safety concerns and unanswered questions with the inspector, and obtain specialist findings and written quotes. Discuss any repair request with your agent and lender. Keep the remaining work in a dated home plan; an old system is not automatically a failed system.

From inspection report to a decision: five next steps

  1. Confirm the deadline

    Ask your agent or attorney to confirm the inspection-response deadline and how notice must be delivered under your agreement.

    Keep: The exact date, time, notice method and responsible person.

    Understand the contingency
  2. Separate the finding from the unknown

    Read the full report and photos. Ask the inspector which concerns need prompt professional attention and which need further evaluation.

    Keep: The report page, the inspector's words and the unanswered question.

    Read the report clearly
  3. Get a scope before choosing a number

    Ask the relevant qualified specialist for written findings and a quote with scope, exclusions and timing. If it cannot arrive in time, discuss your options before the deadline.

    Keep: Who evaluated it, the written scope, the quote date and what remains uncertain.

    Compare repair and credit options
  4. Agree what happens next

    Review a focused request with your agent. Confirm lender constraints before agreeing to a credit or repair arrangement, and document any agreement in writing.

    Keep: The agreed work, responsible party, completion evidence and verification step.

    Check completed work
  5. Keep the remaining work useful

    After closing, keep unresolved questions, service records and planned work together. Give each item a next action, owner and review date.

    Keep: A first-year plan that can change when better evidence arrives.

    Build the first-year plan

HomeScore editorial sequence, reviewed September 22, 2026. CFPB: inspections, repairs and closing explains why additional evaluations, contract terms and lender requirements matter. This sequence is general planning guidance; your agreement and qualified advisers determine your options.

A worked example: six findings, and what each one actually tells you

The six findings below are invented for this example and labelled as such. They are written the way inspectors tend to write, because the skill worth practising is separating what the report establishes from what is still unknown. Evaluation by a specialist is a next step, not a sixth category: the five buckets stay Bucket 1 — Immediate safety, Bucket 2 — Negotiation & credit decisions, Bucket 3 — Major near-term systems, Bucket 4 — Routine maintenance, Bucket 5 — Monitor & watch.

Electrical — Bucket 1 — Immediate safety Fictional example

“Two conductors observed under a single breaker terminal in the main panel. Recommend evaluation and correction by a licensed electrician.”

What this establishes
The inspector saw a wiring condition they want corrected, and named who should correct it.
What is still unknown
Whether anything else in the panel shares the same condition, and what correcting it involves here.
Who can verify it
Licensed electrician, with the panel photo and report page in hand.
What it means for your first year
Once corrected, the electrician's invoice becomes the first entry in your electrical record.
How a professional finding could change the priority
If the electrician finds the condition is isolated and simple, it stays a safety correction and closes. If they find wider panel problems, the cost and scope may also make it a Bucket 2 conversation with the seller.

Roof — Bucket 2 — Negotiation & credit decisions Fictional example

“Granule loss and lifted shingles observed on the south slope. Active leakage not observed at time of inspection. Recommend evaluation by a roofing contractor.”

What this establishes
There is visible wear on one slope, and the inspector did not see active leakage on that day.
What is still unknown
Whether the underlayment or decking is affected, and whether this is a repair or a replacement. Visible wear does not establish remaining life.
Who can verify it
Roofing contractor, asked for a written scope and price for repair and for replacement.
What it means for your first year
Whichever you choose, the scope and date set your next roof review.
How a professional finding could change the priority
A roofer's written scope is what decides this. A small, defined repair may drop it to Bucket 4. Evidence of water entry can move it to Bucket 1 or Bucket 3.

Foundation — Bucket 2 — Negotiation & credit decisions Fictional example

“Stepped cracking noted in the masonry at the northeast corner. Cause not determined. Recommend evaluation by a structural engineer.”

What this establishes
The inspector saw a pattern they could not explain and asked for a specialist.
What is still unknown
The cause, whether it is moving, and what if anything it requires. Crack width alone does not answer this.
Who can verify it
Licensed structural engineer, for a written opinion with a defined scope.
What it means for your first year
The engineer's opinion, plus dated baseline photos, becomes what you re-check against later.
How a professional finding could change the priority
Evaluation is the next step, not a category of its own. The engineer's written opinion is what places this: stable and cosmetic points to Bucket 5, active movement points to Bucket 3 and changes what you ask for.

Heating and cooling — Bucket 5 — Monitor & watch Fictional example

“Condensing unit data plate illegible. Equipment responded to thermostat call at time of inspection. Service history not available.”

What this establishes
The system ran during the inspection, and nobody can tell you its history yet.
What is still unknown
Its installation date, model and service record. An unreadable label is missing information, not evidence that the unit is old, and a working system of unknown age is not automatically a near-term replacement.
Who can verify it
HVAC contractor, for an inspection that identifies the equipment and reports its condition.
What it means for your first year
Record the model, filter size and service date so the next decision starts from facts.
How a professional finding could change the priority
A contractor's condition report can move this either way: a fault or failing component makes it Bucket 3, a clean report leaves it a watch item with a service record attached.

Drainage — Bucket 4 — Routine maintenance Fictional example

“Downspout at the rear elevation discharges within one foot of the foundation. Soil slopes toward the structure at this location.”

What this establishes
Water is being directed toward the house at one specific spot.
What is still unknown
Whether it has caused anything inside. The report does not claim that it has.
Who can verify it
You, first: photograph the area during and after rain. A landscaper or contractor if regrading or an extension is needed.
What it means for your first year
Dated before-and-after photos plus the work done make this easy to review next season.
How a professional finding could change the priority
If you find interior moisture at the same corner, this stops being routine and belongs with the foundation question instead.

Life safety alarms — Bucket 1 — Immediate safety Fictional example

“Smoke alarm in the upstairs hallway did not respond to test button. No carbon monoxide alarm observed on the lower level.”

What this establishes
One alarm failed its test, and one type of protection was not observed at all.
What is still unknown
Whether other alarms are past their manufacture dates, and what your local requirements are.
Who can verify it
You, following the device instructions; a licensed electrician for hardwired or interconnected units.
What it means for your first year
Log device type, manufacture date and install date so replacement is not guesswork later.
How a professional finding could change the priority
Nothing here waits on a negotiation outcome. Working detection is restored first, and the record is written afterwards.

Printable repair planner

The planner has a filled example and blank space for your own report. Open the printable repair planner — a separate landscape page that prints on its own, with no signup and nothing saved.

Report pageItemWhat the report saysConfirmed or unknownQuestion to askNext action / whoWritten quote: source + dateNext reviewCompleted work + receipt
p. 12Main panelTwo conductors under one breaker terminal; electrician recommendedConfirmed condition, unknown extentIs this the only terminal like this, and what does correcting it involve?Licensed electrician— (waiting on written quote)After correctionInvoice + photo of corrected panel
p. 21Roof, south slopeGranule loss and lifted shingles; no active leakage observedUnknown remaining lifeRepair or replacement, and what is included in each?Roofing contractor—Next heavy rain 
p. 8Upstairs hallway smoke alarmDid not respond to testConfirmedIs this alarm past its manufacture date?Me — device instructionsn/aMonthly testReplaced 2026-09-15, receipt saved

Three questions to ask whoever you call

  1. What did you find, and how does it compare with what the report described?
  2. What exactly is included in the work you are quoting, and what is not?
  3. What would you want to look at again, and when?

Before closing versus after closing

Still under contract: your contingency window and your purchase agreement decide what is possible, so read the actual clause with your agent or attorney. Use the window for verification, written quotes, and one focused ask. Anything a lender may require is a question for your lender, in writing, not an assumption.

Already closed: negotiation is over, so the planner becomes a maintenance sequence instead. Resolve anything unsafe or actively wet first, then work through the unknowns in the order that matters for your home, and let the rest become dated entries you review each season.

From completed repair to home record

Example: the upstairs smoke alarm failed its test, you replaced it the same week, and you kept the receipt. The record entry is four fields — what was done, the date, who did it, and when to check again. Do that for each completed line and, a year later, you have a history instead of a memory.

Keep your repair plan with your home.

Create your private account, add your address, and bring your inspection findings across. You review everything before saving. Nothing from the public analyzer transfers automatically. Start free, add a card to begin a 30-day free trial.

Start My Home Plan

Related on HomeScore